COMACOE provides a range of near shore marine construction
solutions using its vast marine expertise, inhouse availability
of specialized marine spread and manpower as also adept
marine management skills. It is not surprising that COMACOE
has been called on to execute some very challenging marine
projects, few of which are listed below:
| ± |
Trenching,
welding and bottom pull for laying of 1.3 km 18” LPG
pipeline across Hadkiya Creek crossing by L&T
for GAIL. This is a part of the longest LPG pipeline
covering an overall distance of 1800 km. |
| ± |
Trenching
welding and laying of 1km 30” pipeline off
Manori, west coast of India for Indian Oil Corporation.
Scope
included underwater blasting of rock, preparing
sand mattress underlay prior to pipelaying as a
part of
the overall trenching process. |
| ± |
Turnkey
construction of effluent disposal pipeline with
multiport diffuser
including trenching and laying of 3.5km 30” HDPE
pipeline and diffuser with antibouyancy blocks,
thrust and reaction blocks for 2 x 125 MW GMDC
Power plant
in Gulf of Kutch. |
| ± |
Dredging
and construction of 1km length, 80m wide gravity
seawater intake channel
for L&T ECC, Akrimota Power Plant. Project
scope included dredging and disposal of material,
preparation
of embankments 2m above maximum tide range, laying
of surface and subsea geotextile (over 110,000
SqM) and rock armor (over 400,00 M3). |
| ± |
Pre trenching services
for 9km offshore pipeline for Essar Projects in Gulf
of Cambay with tide range of 10m and currents peaking
at 6 knots. |
| ± |
Driving of PU 16
sheet piles for pipeline embankment for Aban Constructions
in Gulf of Cambay |
| ± |
Dredging for removal
of stone boulders upto 2T in weight from abandoned
breakwater project in Dahej, Gulf of Cambay for Ballast
Nedam-IHI-Toyo Consortium. |
| ± |
Pre trenching services
for Uran-Trombay pipeline project for Punj Lloyd
Ltd. |
The increased environmental sensibility all around the
coasts, has enhanced the usage of marine outfalls to
discharge the treated effluents in the sea at adequate
distance depending upon the regional regulations. Focus
on overall infrastructure development and plans for several
pipelines landfalling along the long Indian coastline
present very good prospects for many more such similar
projects.
Dedicated and specialized marine spreads comprising
of 4 point mooring crane barges, spud barges with extended
reach excavators, cutter and agitation suction dredgers,
crane mounted jack up barges, diving spreads are used
for meeting challenging marine project execution. COMACOE
has built a steady reputation for being a dependable
marine contractor in the oil & gas and infrastructure
domain.
Past Experience/Clients
| ± |
GMDC |
| ± |
Essar Projects |
| ± |
Ballast Nedam-IHI-Toyo |
| ± |
L&T ECC |
| ± |
Aban Constructions |
| ± |
Indian Oil Corporation |
| ± |
Gas Authority of
India |
|